Fawbeld steel products logo
Made in Britaion logo
Call us for more info box

Flood Alleviation

The nature of flooding events are changing with a significant increase in flash flooding caused by torrential rainfall together with inadequate surface water drainage. This kind of flooding can take place anywhere and is not limited to areas that are usually in danger from river or coastal flooding. Along with the introduction of the SUD's (see our news page)bill architects and engineers alike will be presented with problems when a standard product will not be suitable. At Fabweld we will work with the client to find a solution and 3D CAD simulation will show designs in situ looking realistic to give end users the visual information to make an informed decision. Once agreed Fabweld can test the product before manufacture using Finite Element Analysis which will validate the load without the need for physical testing, reducing costs to the end-user. After design approval the product will be fabricated in our Telford factory and delivered direct to site. Tight deadlines are our specialty and our problem solving skills ensure we deal with the query efficiently with our unrivalled service and rapid lead times. To find out more please click here (PDF)

drainage


flood_management_pic


Why use us

Fabricated access cover trade association members (FACTA)
enquire buttonSpecialists in design and manufacture of bespoke products
P
eople that are passionate about delivering outstanding customer service

 

Click here to view FACTA specifications

temp